GENERAL HOSPITAL OF FUERTEVENTURA

Fuerteventura, Spain

GENERAL HOSPITAL OF FUERTEVENTURA

Fuerteventura, Spain

GENERAL HOSPITAL OF FUERTEVENTURA

Fuerteventura, Spain

GENERAL HOSPITAL OF FUERTEVENTURA

Fuerteventura, Spain
1st. Public Competition Prize

Built m2: 50,710

Material Execution Budget: €52,216,158.40

Year: 2003

Completion date: 2014

Promoter: Canary Islands Health Service

MEMORY

In the first phase, the two most pressing problems that the Hospital has from a healthcare point of view are being solved, which are its shortcomings in the areas of emergency and outpatient consultations and functional tests. Acting on each of these areas in new implementations requires developing the corresponding connections of these units with the current central services of the hospital, without prejudice to the future connection with the definitive services.

In the second phase, the aim is to give continuity to Phase I. To do this, the same façade material and the same window compositions are used, using on ground floors the greatest possibility of opening gaps to improve lighting.

The meshes that cover the facilities are also planned as those of Phase 1, based on metal-wire supports and lattices. The substantial change proposed in this phase is that the hospital’s traffic is clearly differentiated.

It is structured with two North-South corridors, which run along a scheme of interior courtyards that contain the vertical communication cores between them and, along them, different support areas for the serviced areas, as well as facilities.

HOSPITAL SERVICES

Hospitalization

  • 240 Beds

Outpatient

  • Outpatient Clinics: 42 Locations
  • Dialysis: 8 Positions

Central Services

  • Surgical Block: 9 Operating Rooms
  • Rehabilitation