Built m2: 17,457.54
Material Execution Budget: €20,333,186.35
Year: 2022
Completion date: 2025
Promoter: Viamed Salud
Contractor: OHLA
MEMORY
The building consists of 4 floors above ground level and a basement. It has an approximate footprint of 145 meters long by 45 meters wide and a height of 16.32 meters. It is organized around a central courtyard 7 meters wide and 70 meters long, which reaches the basement and provides natural light and ventilation at all levels.
Distribution by Floors:
Basement Floor: Dedicated to parking and hospital support services, such as warehouses, maintenance and waste management.
Ground Floor: Contains services with close access to the main lobby, such as outpatient clinics, diagnostic imaging, and emergencies.
First Floor: Groups the hospital’s technical services.
Second and Third Floors: They are intended for hospitalization units.
Parking: Includes an underground parking lot with a total of 64 spaces, of which 4 are reserved for people with reduced mobility. On the surface, there are 75 spaces, with 2 accessible for the disabled, complying with accessibility regulations.
HOSPITAL SERVICES
Hospitalization: 96 rooms
Adult and pediatric emergency rooms
Outpatient services: 30 outpatient consultations
Surgical block: 11 operating rooms, 1 hemodynamics room, 3 UTPR, 22 resuscitation stations, 2 endoscopy rooms
ICU: 7 stations
Day hospitals: 13 stations
Project images



Other projects
Valdecilla Hospital Phase III
Santander, Spain
RUMEU SPECIALIZED CARE CENTER
Tenerife, Spain
OURENSE HOSPITAL COMPLEX
Ourense, Spain
General Hospital of Fuerteventura
Fuerteventura, Spain
MANACOR REGIONAL HOSPITAL
Palma de Mallorca, Spain
DON BENITO HOSPITAL
Badajoz, Spain